Torre Abbey Sands, Phase 3

Posted by on May 13, 2011 in Civil Engineering

Between October 2009 and March 2010, SWH carried out refurbishment works to a 100m section of promenade and steps on Torquay seafront.

The works comprised the cleaning of algae from the existing concrete, scabbling all existing surfaces and installation of dowels, prior to overlaying the existing concrete with 120mm of new fibre reinforced concrete.

The works were located on the main sea front in Torquay, at a location known as Torre Abbey Sands.

The works were within the tidal zone and the various operations had to be carefully planned to make best use of the available 'dry' time. Access was only available from...