Skip to main content

Priorswood Primary School, Taunton, Somerset

Priorswood Primary School (Learning Environment)

This north Taunton school and foundation unit for children aged two to eleven years needed new catering and dining facilities.

A large new industrial kitchen was built right in the heart of the school. A brick building was designed to match the adjoining buildings.

SWH Build always offers a positive contribution and suggested all ventilation equipment be positioned on the roof to maximise floor space. The change was adopted and helped resolve the complexities of the mechanical and electrical installations.

SWH Build worked with the school to ensure the best route for a new gas main. New intercom, CCTV and barrier installations also formed part of the scheme.

Once constructed, we fully fitted the kitchen, including the complete installation of a new suite of commercial kitchen equipment.

Constant liaison with the school’s senior management team and careful control of interfaces with pupil areas meant this scheme was completed on time and without disruption.

Take a look at our Case Studies to see more of our work in schools and education environments.

This entry was posted in Building Construction and tagged education works, refurbishment, schools, swh build by . Bookmark this permalink.